Data · The Return on Time
The Ledger
Every claim in these essays is tested the same way: real teams, real projects, the same clock before and after.
1The measure
ROT = hours returned ÷ hours invested
Above one, the change paid for itself. Below one, it didn't, and that result is published too.
2The protocol
- Pick the work that repeats. A task the team does every week, the same way, by hand.
- Time it the old way. Real projects, real clock, logged by the people doing the work.
- Change the system. Automate the repetition. Leave the judgment with the engineers.
- Time it again. The same kind of project, measured the same way.
- Let the team sign it. The team's manager confirms the numbers. Then they are published, good or bad.
3Results
| Study | Team | Work measured | Before | After | ROT | Status |
|---|---|---|---|---|---|---|
| 01 | Manufacturing engineering | Drawing release; part data entry | — | — | — | Starting |
4In their words
Each signed study adds the team's own account here, confirming the specific numbers in Table 1. Not praise; confirmation. The first study is starting.
To put your department on the ledger, write through Correspondence.